The room the whole house ends up living in

A kitchen remodel is the project where design decisions, trade work, and scheduling all have to agree at once. Cabinetry, counters, tile, plumbing, electrical, ventilation, and appliances each depend on the others being right, which is why kitchens punish the hire-five-separate-people approach harder than any other room.

We take the whole thing — the design help, the ordering, the permits, the trades, and the schedule — so the only decisions left to you are the ones you actually want to make. GIL Renovation Services holds Florida licence CBC1269967 as a Certified Building Contractor, so if your kitchen needs a wall moved or an opening widened, the structural work stays with the same company that is hanging the cabinets.

We remodel kitchens across Jacksonville and Duval, Clay, St. Johns, and Nassau counties.

A white kitchen with a navy blue island, gold pendant lights and a patterned tile backsplash

You choose your finishes with a designer, not off a phone screen

Through our partnership with Floor & Decor, you work directly with an in-store designer on cabinetry, countertops, tile, flooring, and hardware — with the actual materials in front of you, at full size, under real light. Colour and texture decisions are far easier to get right when you can put the counter sample against the cabinet door and the backsplash tile in the same hand.

Your selections go onto a form under our account. From there we purchase everything, pick it up, and deliver it to the job site, so you get the enjoyable part of a kitchen project without managing orders, deliveries, back-orders, or returns.

Two genuinely different projects

A finish-only refresh

The kitchen stays where it is. Sink, range, and refrigerator keep their positions, and the work is cabinetry, counters, backsplash, flooring, paint, and hardware.

Nothing moves inside the walls or under the floor, so the schedule is shorter and the cost is more predictable. If the layout already works and it is the finishes that have aged, this is usually the right answer.

A layout change

The room itself changes — an island where there was a peninsula, a wall opened to the living space, the sink moved to the window, a proper pantry where there was none.

This means permitted plumbing and electrical work, and often structural work with a beam and a load path. It costs more and takes longer, and when the current layout is the actual problem it is the only thing that fixes it.

What actually drives the cost of a kitchen

We do not publish a kitchen price range, because the honest spread between a finish refresh and a full layout change is wide enough to be useless as a guide. These are the six things that move the number — and your written proposal puts a real figure against all of them within 48 hours of the consultation.

Layout change or existing footprint

Keeping sink, range, and refrigerator where they are is a very different project from moving them. Relocating plumbing and gas or electrical runs adds permitted trade work under the floor and inside the walls.

Cabinetry grade

Cabinets are usually the largest single line in a kitchen. Stock, semi-custom, and custom differ in price, in lead time, and in how well they fit an irregular room.

Countertop material

Quartz, granite, butcher block, and laminate sit at genuinely different price points, and the amount of counter run and the number of cut-outs matter as much as the material choice.

Appliance specification

You buy the appliances, so this line is entirely in your control — but the spec drives cabinet openings, ventilation, and the electrical or gas work behind them, so it has to be settled early.

Tile, backsplash, and flooring

Square footage, tile size, and pattern all affect labour as well as material. A herringbone or a large-format tile is more work to set than a straightforward stack.

What we find behind the walls

Older wiring, out-of-level floors, or plumbing that was never quite right add scope. We flag anything we can see at the consultation so the proposal is as close to final as it can honestly be.

Cabinets set the schedule, not the crew

The most common reason a kitchen project drifts has nothing to do with how fast anyone works. It is cabinetry lead time — the gap between ordering and delivery is almost always the longest single item on the calendar, and it is the one item no amount of effort on site can shorten.

So we front-load it. Selections and appliance models are settled early, cabinets go on order before demolition rather than after, and the rest of the sequence is planned around the delivery date we are actually given. Appliances matter here for the same reason: cabinet openings, counter cut-outs, and ventilation are built to the exact models you chose, so the appliance list gets locked before the order goes in.

Planned properly, the wait happens while you still have a working kitchen — not after it has been torn out.

A white kitchen with a hexagonal tile backsplash, walnut counter and stainless range

How a kitchen remodel runs

Selections and ordering come early on purpose. Everything after demolition depends on materials already being on their way.

  1. 1

    On-site consultation and measurements

    We measure the room, talk through how your household actually uses it, and work out whether the kitchen you want fits the existing footprint or needs the layout to change.

  2. 2

    Written proposal within 48 hours

    Full scope and price in writing within two days, so you are making a decision on real numbers rather than a verbal estimate you have to remember.

  3. 3

    Design and selections at Floor & Decor

    You sit down with an in-store designer on cabinetry, counters, tile, flooring, and hardware. Selections go onto a form under our account and we handle the purchasing from there.

  4. 4

    Cabinet and material ordering

    Cabinetry goes on order first because it has the longest lead time, and appliance models are locked at this point because the cabinets are built around them.

  5. 5

    Permits and demolition

    We pull whatever the scope requires, then strip the room out. Where plumbing, gas, or electrical is moving, our licensed subcontractors work under our master permit.

  6. 6

    Rough-in, drywall, and flooring

    Plumbing and electrical rough-in while the walls are open, rough inspections, then drywall, paint prep, and flooring — all before a single cabinet is hung.

  7. 7

    Cabinets, counters, tile, and final walkthrough

    Cabinets set, counters templated and installed, backsplash tiled, fixtures and hardware fitted, then final inspection and a walkthrough with you. The one-year workmanship warranty starts at completion.

Kitchen remodeling questions

The five questions everyone asks before hiring, plus the ones specific to kitchens.

It depends on the size and scope of the work, so we price every project individually after seeing it in person. As a concrete reference point, a small bathroom of roughly 7x5 typically runs $10,000 to $14,000, and a master bathroom typically runs $17,000 to $35,000, with materials included in both. Your written proposal arrives within 48 hours of the on-site consultation and lays out the full scope and price, so you are never comparing guesses. Estimates and consultations are free.

Ready to start on the kitchen?

Tell us what is not working about the room you have. We will come out, measure, talk through layout against finishes, and put a full written proposal in your hands within 48 hours — free, with no obligation.